Express was called in to fix a cracked production floor. We found the real cause, fixed it and set up a way to watch it.
CUSTOMER
Redbriar, Inc.
CUSTOMER TYPE
General + electrical contractor
LOCATION
Burgettstown, PA
PRODUCTS
Concrete Mender + Flexible Cement II
PRODUCT FORM
Cartridges
OUR ROLE
Self-performed
01 / THE CHALLENGE
A floor crack with a moving cause.
Redbriar, Inc. called Express to repair a crack in the floor of the Union Electric Steel production facility in Burgettstown, PA.
When our crew arrived, we saw the real story. The floor had cracked because the outside wall of the building was moving.
So the fix had to go past the crack itself.
02 / HOW IT UNFOLDED
Repair it. Relieve it. Watch it.
Our recommendation went past the patch. Three steps, all self-performed by us.
STEP 01
REPAIR THE CRACKS
10 Minute Concrete Mender went into the cracks in the floor for a fast, permanent repair.
STEP 02
CUT A NEW JOINT
As an added precaution, we cut a new control joint and filled it with Flexible Cement II, a high strength, flexible joint sealant.
STEP 03
GAUGE THE WALL
We installed a crack gauge so the team can monitor any future movement of the wall.
03 / THE RESULT
Done in about 3 hours. With time left over for bonus work.
3HRS
About how long the job took, start to finish.
3
Extra thresholds repaired with the leftover time.
1
Crack gauge installed to monitor the wall.
THE FINISH
FIXED AT THE SOURCE.
Cracks repaired, a new control joint to take the movement and a gauge to watch the wall. Then, with time left on the clock, 3 bonus thresholds in other areas of the plant.
PRODUCTS USED ON THIS JOB
10 Minute Concrete Mender
A PennDOT Bulletin 15 approved urethane hybrid repair material for cracks in concrete. Cartridges make it fast to place on targeted repairs like this one.